It will also allow the export of the valuable, information-rich IFC, which is increasingly used not only for cross-industry coordination but completely replacing drawings. In order for everything to work as it should in this way of working, it is important to provide a good quality 3D model of the structure, which is not just a random 3D solid, but contains all the necessary information systematized and organized according to procedures. Clicking on the name of a given element in the documentation takes you to its geometric representation in the 3D model. Clicking on an element in the model gives us access to information about it. Non-graphical information (such as schedules, device specifications, etc.) is linked to the 3D model, making it easy to explore the necessary information. The key difference in the BIM approach as opposed to traditional ways of working is that all information about an object is clearly structured and easy to find in one place (in the CDE platform). ![]() This concept covers processes, a method of operation that ensures the most effective implementation of a construction project. ![]() You have heard the statement many times that BIM is more than a 3D model.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |